Quote

From:

210 E. Broad St, #210-D
Forney, Texas 75126
(214) 347-2304
www.kbstewart.com

Quote Number QUO-2657
Quote Date March 5, 2020
Total $7,100.00
To:
Chia-Pin Hsu
Hrs/Qty Service Rate/PriceAdjustSub Total
1 Shower Demolition

Removal, hauling and disposal of shower walls and floor.

$800.000%$800.00
1 Shower Repair and Remodel

Leak repair and installation of plumbing, tile walls and floor (seat included).

$2,900.000%$2,900.00
1 Garage Ceiling Repair

Sheetrock repair.

$370.000%$370.00
1 Material

Drywall, cement, lumbar, mortar, grout, PP, liner, plumbing, drain (faucet not included), tile (116 sq ft.), seat, caulking, shower door seal.

$3,030.000.00%$3,030.00
Sub Total $7,100.00
Tax $0.00
Total $7,100.00

Leave a Reply