Quote Number QUO-2654
Quote Date February 18, 2020
Total $41,136.85
To:
Ramon Broadway
Hrs/Qty Service Rate/PriceAdjustSub Total
1 Foundation

We propose to provide labor, materials and equipment to perform following: Excavate existing soil for new house slab to include 335 linear feet of 36” deep foundation beams with (2) #5 rebar top,center and bottom with #3 stirrups at 3” on center. 1200 square foot of slab to be reinforced with
#3 rebar 12” on center each way and include 6 mil vapor barrier underlayment. Note: majority of the slab is 4” with exception of the garage area where concrete is 5” thick. Dirt work installation by others. Testing lab by others.

$33,143.000%$33,143.00
1 Driveway, Sidewalk and Approach

We propose to provide labor, materials and equipment to perform following, fine grade areas for new 5” thick driveway - 350 sq. ft, 4” thick sidewalk - 210 sq. ft and 6” thick approach 155 sq. ft. Install #3 rebar 18” on center and place concrete, broom finish. Note: demo of existing concrete (if needed). Not included at this time.

$7,993.850.00%$7,993.85
Sub Total $41,136.85
Tax $0.00
Total $41,136.85