Quote

From:

210 E. Broad St, #210-D
Forney, Texas 75126
(214) 347-2304
www.kbstewart.com

Quote Number QUO-2658
Quote Date March 3, 2020
Total $2,150.00
To:
Alex DeCicco
Hrs/Qty Service Rate/PriceAdjustSub Total
1 Driveway Repair

126 sq. ft. (Concrete repair/ installation for 9x14 section near side walk), 4.5" thick, concrete, #3 rebar, grading, backfield dirt, broom-finish (Demolition and re-pour of existing damaged area). Includes labor, materials and equipment.

$2,150.000.00%$2,150.00
Sub Total $2,150.00
Tax $0.00
Total $2,150.00

Leave a Reply